Login

Allow extra time on the Ore, Ondo and Akure road

TrapGetting Around
  • Ondo, Nigeria
  • Posted on

About this trap

The federal road through Ore, Ondo and Akure is being rebuilt as a dual carriageway, with a 24-month timeline set in 2024. In September 2026 a civic group reported that work on large sections had stood still for about five months. Expect rough stretches and slow traffic. Travel in daylight, leave a buffer of an hour or more before any flight or booking, and ask your driver which section is slowest right now.

Where

Allow extra time on the Ore, Ondo and Akure roadOre-Ondo-Akure federal road

Open in Google Maps(opens in a new tab)

Know Ondo well?

Share a tip, or warn travelers about a trap. It only takes a few minutes.

New post